Irrigation System Upgrades Project

PROJECT SCOPE: The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: replacement of irrigation controllers and the installation of master valve flow sensors in street medians west of Dougherty Road, including demolition, irrigation, electrical, restoration and other items not specifically mentioned herein, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Technical Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars.

Status

Accepting Bids

Prebid Date 4/15/25 2:00pm
Bid Date 5/6/25 2:00pm

Company & Contacts

City of Dublin
Rosemary Alex  

Location

Dublin, CA

COST ESTIMATE: The City’s estimated total construction cost for this Project base scope is between $425,000-$500,000. The estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost range.

Contractors bidding the project are required to attend the mandatory pre-bid conference prior to bidding. The pre-bid conference is scheduled for April 15, 2025 at 2:00 P.M. and April 23, 2025 at 10:00 A.M., and will be located at the City Corporation Yard 5709 Scarlett Court, Dublin CA 94568. Bids will not be accepted from contractors that do not attend one of the pre-bid meetings. Sub-contractors are not required to attend the pre-bid conference.