2025 Surface Seal Project
The general items of work to be done hereunder consist of: Mobilization; traffic control and construction signage; Storm water pollution prevention plan, striping removal, changeable message signs, adjusting utilities to grade, concrete curb, gutter sidewalk and driveway; cold planning; subgrade over-excavation; AC patch paving; crack sealing, rubber chip seal, slurry seal; curb ramps; striping and pavement marker installation, paving art, speed bump, and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Plans
(click to expand/collapse)

Name | Size | ||
4.8.25 - El Cerrito 2025 Project Plans (1) | 20.1 MB |