Sidewalk Rehabilitation Program Phase 10

Description: Repair of sidewalks at 36 locations throughout the City including, but not limited to, removal and replacement of concrete sidewalk, concrete driveway approach, concrete curb and gutter, and as-needed tree maintenance work such as root shaving and root pruning.
Plans (click to expand/collapse)
Name Size
Phase 10 Plans 2025-04-11 5.1 MB