Pavement & Curb Rehabilitation Project - Marin Ave Phase 2

Work generally includes, but is not limited to, 2-inch to 3-inch HMA milling, 4-inch cold in-place recycling, 2-inch to 3-inch HMA inlay, 12-inch full depth HMA, sidewalk, curb, gutter, and curb ramp improvements, installation of storm drain inlets and other storm drain improvements, installation of traffic striping, pavement markings, and K71 reflective bollards, improvements at existing traffic signals, and installation of Rectangular Rapid Flashing Beacons. The Project also includes a bid alternative for intersection street lighting improvements.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
C24-57 Addendum No1_cover 127.2 KB
C24-57 Addendum No1_sheets 1.2 MB
Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
C24-57 Addendum No2_cover-RFI responses 141.6 KB
C24-57 Addendum No2_sheets 66.5 KB
Addendum 3 (click to expand/collapse)
Name Size
C24-57 Addendum No3 216.9 KB