Orinda Way Pipe Lining
General work description: The work to be done generally consists of fold and form PVC ining approximately 235 lineal feet of approximate diameter 24” storm drain pipe (both CMP and RCP). Cleaning and grout filling voids is also required, in addition to handling stormwater bypass.
Status
Accepting Bids
Prebid Date | 6/5/25 10:00am |
Bid Date | 6/17/25 2:30pm |
Location
City of Orinda
Engineer's cost estimate: $125,000
A non-mandatory pre-bid meeting will be held on Thursday, June 5, 2025 at 10:00 a.m. at the work location, near 20 Orinda Way, Orinda, CA 94563 to cover project construction. Prospective bidders attendance is recommended but not mandatory