Wildcat Canyon Road Slope Failure Repair Project

The work to be done generally consists of repairing an embankment failure by excavating slide debris, constructing a solider pile retaining wall, rebuilding the embankment with lightweight cellular concrete fill, replacing the cross culvert drainage system, reconstructing roadway surface, completing associated site grading, installing railings, and installing erosion control measures.
Plans (click to expand/collapse)
Name Size
CCC_Full Plans_6266 18.6 MB