Wildcat Canyon Road Slope Failure Repair Project
The work to be done generally consists of repairing an embankment failure by excavating slide debris, constructing a solider pile retaining wall, rebuilding the embankment with lightweight cellular concrete fill, replacing the cross culvert drainage system, reconstructing roadway surface, completing associated site grading, installing railings, and installing erosion control measures.
GFE
(click to expand/collapse)

Name | Size | |||
CCC_DBE_6266 | 1.2 MB |
Proposal & Contract
(click to expand/collapse)

Name | Size | ||
CCC_PC_6266 | 841.8 KB |
Reference Documents
(click to expand/collapse)

Name | Size | |||
Wildcat Canyon Road Repair Cross Sections 20250311 | 4.0 MB | |||
Wildcat Canyon Road Repair Geotechnical Report | 16.9 MB |
Special Provisions
(click to expand/collapse)

Name | Size | ||
CCC_SP_6266 | 2.1 MB |